Thanks! As much as I enjoy doing these types of projects I'm pretty sure my 2012 - 2013 calendar is full. Since I have neglected everything else around the house to get this project complete I still have lots to do.
1 bedroom and the great room still need to be redecorated, then I move into the basement where we have had some water damage and I need to rip out some drywall and flooring and figure a way to make the revamped area waterproof up to 8" deep. Next spring I want to redo the entire backyard with cobblestone paths, gardens and firepit, front yard I need to extend the existing porch possibly with wood decking then of course the wood trim on the house needs to be painted...AGAIN! So needless to say I'm pretty full through 2013.
There are currently 1 users browsing this thread. (0 members and 1 guests)